Acquisition calendar: Berms site

Day Ground Aircraft Satellites Local Time Flight
direction
Beam mode Resolution Incidence
angle (°)
Polarization
June 15th Soil moisture
measurements
RADARSAT-2 7:25 AM D Quad-pol 9 m x 6 m 24.7–26.3 HH, VV, HV, VH
SMOS 6:33 AM A Pol 30–50 km 0–55 H and V
AMSR-E 3:59 AM D Pol 48 km 55 H and V
RADARSAT-2 6:50 PM A Standard 25 m 41.7–46.2 HH, HV
SMOS 8:13 PM D Pol 30–50 km 0–55 H and V
AMSR-E 1:33 PM A Pol 48 km 55 H and V
June 16th Soil moisture
measurements
EC
NASA
SMOS 5:55 AM A Pol 30–50 km 0–55 H and V
ASAR 11:29 AM D Wide 150 m 15–50 HH or VV
ALOS 10:52 AM D Fine Dual 20 m 34.3 HH, HV
AMSR-E 3:04 AM D Pol 48 km 55 H and V
SMOS 7:35 PM D Pol 30–50 km 0–55 H and V
AMSR-E 2:16 PM A Pol 48 km 55 H and V
June 14–16
and
July 13–20
Detailed
measurements
of forest
characteristics

Back